Hi BW Experts,
we are planing to migrate some old 3.5 Dataflows towards the new 7.x logic. We want to use the migration Wizzard as we already on BW 7.40 SP04.
Our plan is, to migration in our DEV system, and transport the changes till productive system. The problem now is, that we do not have InfoPackages in the DEV system, as they are only available in the productive system.
My concerns are that when migrating in DEV and transporting towards productive we are loosing the deltamechanism of the extractors.Is this correct or does the deltamechanism still work after migrating without the infopackages? As a new init would take very long this is quiete a danger point for this project.
Thanks in advance for your answers.
Best regards
Christian