In-process inspection of production order

$
0
0

Hi friends,

 

This is my client requirement.

My client wants to  assign four operations in Routing for producing Finished material .

 

In four operations, client wants to put  quality check on 2nd and 4th operation only.

 

For in process, 2nd and 4th operations quality check I  can give control key "PP04--In house Production for Inspection"  by

assigning "MIC" .

 

and After creation & release of production order inspection lot is created.

 

 

During  Results Recording and Usage Decision the system is allowing to do the confirmation for the 2nd Operation

by using T-code: CO11N

but when we go for confirming the 4th operation the system is not providing us with the required Inspection Lot

so that the In Process inspection can be continued / completed.

 

 

 

Please suggest