Hi Guru's,
I am running MRP for a FG with the "Create PR indicator as 2 (PR in Opening Period).
1. A planned order is getting created as I am looking for PR. What does this PR in Opening Period do ?
2. So, when I am trying to convert the planned order using COHV, I am not able to see this planned order & other planned orders in the list. Why is it so ?
3. I am manually converting the planned order to PR. But the problem here is " system is automatically checking the firming indicator for the PR " because of this after next MRP run there is no change in the PR qty even though we have stock of this material in system. I do not want system to firm the PR.
4. If the conversion of planned order to PR happens through COHV then, this firming indicator on PR will not happen. Is it correct ?
Thanks in advance.
Regards
Kalyan